摘要本文主要进行了35200DWT散货船机舱舷侧212分段的机装生产设计。该过程主要分为以下几步:首先对该分段专业内信息进行整理做好设计的前期准备,然后按照设计规范对该分段进行合理的前期规划。规划后,运用TRIBON软件进行选型建模,再根据规划图对该分段的管系及舾装设备进行综合放样。接着对模型进行多专业间协调并优化,让管系与舾装件的设计更加完善。最后,根据协调后的模型在TRIBON软件中进行相关图表的绘制。49400
整个设计的过程中,需要时刻考虑现场安装的合理性与经济性,考虑现场施工的各种问题,考虑设计的管系与舾装件符合工厂的实际加工能力。通过这些要求,从而最大限度的达到节约生产加工成本,加快工程的整体进度的目的。
毕业论文关键词:前期规划;生产设计;综合放样;专业协调;图表绘制
Abstract
This paper describes the segmented machinery fitting design process of the side of the 35200DWT bulk carrier in cabin.this course mainly pided into the following steps: First, collect all useful information of the whole section for design, second, layout this area in a logical way after know the design specifications well. Planning is finished,To use the TRIBON software choosing the type and building the models.Once more,according to the planning chart to design the pipe and outfitting equipment models. At last harmonize all models of the area with other departments, and modify all which needed. This make the pipe system and outfititem more perfect.Finally,according to the model which were after coordinating to draw the related chart in the TRIBON software.
Throughout the design process,I constantly need to account of the rationality and economic of field installation, the construction issues at the design stage and design the pipe and outfititem relating to the actual processing capacity of factory. Through these requirements to maximize savings production and processing costs and accelerating the overall progress of the project.
Keywords: Prophase planning;Production design;Comprehensive lofting;Chart drawing;Professional coordination
目 录
第一章 绪论 1
1.1 研究课题的意义 1
1.2 船舶机装生产设计的现状和趋势 2
1.3 船舶生产设计的内容和过程 3
1.4 课题研究的内容和方法 4
1.5 本章小结 5
第二章 35200吨散货船212分段机装的前期规划 6
2.1 35200吨散货船的主要性能 6
2.1.1船舶概况 6
2.1.2主要参数 6
2.2相关舱室分布及设备简介 7
2.3机装的整体前期规划 9
2.4本章小结 14
第三章35200吨散货船212分段管系的生产设计 15
3.1管子的选用原则 15
3.2管路的管材选择 15
3.2.1管材的外径计算 15
3.2.2管材的壁厚计算 16
3.3管路布置的基本规范 17
3.4运用TRIBON软件进行管系放样 18
3.4.1管系放样 18
3.4.2管系的连接件的设计