    关键词:安全评价;模糊综合评价;危险有害因素;重大危险源
    Study on risk assessment and Countermeasures in a new project
    Abstract:The theory of safety evaluation has been established since the 1950s. People came to know its important role to improve the level of safety management of enterprise, reduce the number of accidents and promote the healthy development of the enterprise. In this paper, in combination with the present situation of chemical production safety in China, make a safety assessment on a new project.  
    This paper enumerates accidents happened in recent years in the chemical industry, according to the accident analysis the cause of the accident and the lesson from this accident. Through searching the literature, I learned the development of domestic and international safety evaluation, present situation and application of the fuzzy comprehensive evaluation method development. This paper summarizes the basic situation of the enterprise, including the project situation, main equipments, storage tank and raw materials etc.. Further understand and grasp the enterprise production process, the main products, equipments, safety evaluation, as to do the groundwork for safety evaluation.
    According to the "casualty workers classification" (GB6441-1986) 20 categories mentioned, for the new projects carried out a comprehensive hazardous, harmful factors identification. The identification of the dangerous harmful material, the project involves a material with nitrogen, HFC-125, HFC-32, R-410A, no dangerous chemical products, intermediate products and by-products. In addition, one of the important project of major hazard identification and safety evaluation, according to the "identification of major hazard of dangerous chemicals" (GB18218-2009) for the identification of dangerous source, the result is still controllable range. The pision of evaluation unit is designed to facilitate the evaluation work, improve the accuracy of evaluation and comprehensive. The evaluation unit is pided into 6 parts for safety assessment. Are: the overall layout and the conventional protection facilities evaluation; evaluation of special equipment inspection records; electrical safety evaluation; evaluation of the safety production management measures; evaluation unit safety inflammable and explosive places; safety evaluation of tank places.
    Qualitative safety assessment method is mainly based on experience and intuition to judge the ability of production system technology, equipment, facilities, environment, personnel and management of the status of qualitative analysis, the evaluation results is some qualitative indexes. Quantitative safety assessment method is the use of a large number of experimental results and extensive accident data statistical analy sis of the obtained indexes or based on rules, quantitative calculation of production system technology, equipment, facilities, environment, personnel and management situation, the evaluation result is of some quantitative indicators. On the evaluation of enterprise equipment, electrical, fire facilities, construction, safety management and process operation is dangerous, harmful factors identification and analysis.
    This paper finally selected for evaluation the issuance of fuzzy comprehensive evaluation, the comprehensive evaluation method based on the membership degree of fuzzy mathematics and the theory of the qualitative evaluation into quantitative evaluation, it is a kind of comprehensive evaluation method in fuzzy mathematics based on, to be affected by multiple factors, according to a certain criterion, gives the possibility of obtaining a thing comment. It has the characteristics of strong, system results in a clear, can better solve the fuzzy, difficult to quantify the problem solving, suitable for all kinds of uncertain problems. For the determination of weights using the analytic hierarchy process method, generally have to go through the following five steps using the analytic hierarchy process: establish the hierarchical structure model; constructing judgment matrix; order in single level; consistency test; the level of total order.
  1. 上一篇:社会工作理念在企业成长中的应用研究
  2. 下一篇:美的制冷家电集团的营销渠道分析
  1. 淮安市盐化工园区对周边...

  2. 工程项目施工安全性分析及防范对策研究

  3. 连云港市东海县西双湖地...

  4. 镇江市京口区汝山路地块项目可行性研究报告

  5. 海安晨朗•东方花园住宅项目营销策划

  6. 管理培训生项目实施的现状研究

  7. 沭阳县建福家园项目市场分析+SWOT分析

  8. 电站锅炉暖风器设计任务书

  9. 当代大学生慈善意识研究+文献综述

  10. 酸性水汽提装置总汽提塔设计+CAD图纸

  11. 中考体育项目与体育教学合理结合的研究

  12. 河岸冲刷和泥沙淤积的监测国内外研究现状

  13. 乳业同业并购式全产业链...

  14. 杂拟谷盗体内共生菌沃尔...

  15. java+mysql车辆管理系统的设计+源代码

  16. 十二层带中心支撑钢结构...

  17. 大众媒体对公共政策制定的影响

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回