菜单
  

    The main production process H65 brass plate: the ingredients - melting - Component Analysis - Holding Furnace - semi-continuous casting - cut the head and tail --- two rolls of hot-rolled - cut the head and tail - Milling (double-sided milling ) - four rolls roughing - intermediate annealing (bell-type annealing furnace) - finishing - finished annealing (air cushion continuous heat treatment furnace) - cleaning - straightening - cut (vertical, horizontal shear) - finished inspection - packaging and storage.
    The number of the manufacturing process to the extent of the intermediate annealing process to determine the hardening rolling, the design maximum allowable H65 brass total processing rate of 70%, and according to the design data, the design of the total working ratio of brass was 90.4%, which must be determined in order to continue rolling intermediate annealing. Calculating the number of intermediate annealing is the most important considerations as to reduce energy consumption and the rolling reduction rate to the maximum allowable working full use of the plastic deformation of the rolling member, to avoid waste of energy. When the entire annealing is complete, final cut straightening, product quality testing, confirmed that products meet the delivery requirements can be packaged in storage, waiting for delivery. Product technical requirements can be summarized as follows: the precise size good shape, high surface smooth performance to meet the technical requirements for the design of the basic premise.
    This design mainly on the production of technical requirements and key H65 brass plate production process (melting, casting, milling surface, rolling and annealing) process characteristics. Chinalco Shanghai Copper Co., Ltd. in accordance with existing production processes and products, carried out on the production process of the development of smelting and rolling system preparation, roller-type system to develop, the ability to check the motor, roll strength checking, use in the design process computer software Visual Basic programming language preparation program to calculate the rolling force and rolling torque of conduct, the use of computer software Auto CAD, drawing diagrams on the roll. To design a realistic production standards and product applications.
    KeyWords: Product design ;H65 brass;Technology process; annealing; check
    目录
    1 绪论    1
    1.1 铜及其合金概述    1
    1.2 我国铜加工技术的发展趋势    1
    1.3 合金设计的基本原则    2
    2 市场分析    3
    2.1 世界铜板带材的消费    3
    2.2 国内外铜板带的需求    3
    2.3 相关产业黄铜板带需求预测    4
    3 设计方案    6
    3.1 生产方法的确定    6
    3.2 产品的技术参数及标准    7
    3.2.1 最终产品规格    7
    3.2.2 产品标准及技术要求    7
    3.3 主要生产工艺和设备简介    9
    3.3.1 主要生产工艺及工序    9
    3.3.2 铜加工主要生产工艺设备    12
    4 工艺制度制定    15
    4.1 熔炼工艺制定    15
    4.1.1 原料分类    15
    4.1.2 配料    15
    4.1.3 铸锭尺寸计算    17
    4.2 加热工艺的制定    17
    4.2.1 加热温度    17
    4.2.2 加热时间    18
    4.3 轧制生产制度制定    20
    4.3.1 变形制度的制定    20
    4.3.2 速度制度的确定    29
    4.3.3 热轧温度制度的确定    35
    4.3.4 冷轧张力制度的确定    38
    4.3.5 辊型制度    43
    4.4 热处理工艺的制定    49
  1. 上一篇:Solidworks芳烃抽提装置二甲苯塔设计+CAD图纸
  2. 下一篇:Fluent工业锅炉氮氧化物生成规律的数值模拟研究
  1. 日水量45000立方米污水处理...

  2. 年产500吨苹果酯B生产车间设计+图纸

  3. 日处理15000吨牛皮箱板纸废...

  4. 年产35000吨对氨基苯酚项目...

  5. 1500kg产氢量氯碱工业中氢...

  6. 日处理65500Nm3(以O2计)空分项目设计

  7. 日处理50000立方米某小城镇...

  8. 十二层带中心支撑钢结构...

  9. 酸性水汽提装置总汽提塔设计+CAD图纸

  10. 杂拟谷盗体内共生菌沃尔...

  11. 中考体育项目与体育教学合理结合的研究

  12. java+mysql车辆管理系统的设计+源代码

  13. 当代大学生慈善意识研究+文献综述

  14. 乳业同业并购式全产业链...

  15. 电站锅炉暖风器设计任务书

  16. 大众媒体对公共政策制定的影响

  17. 河岸冲刷和泥沙淤积的监测国内外研究现状

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回