    5. Structure is simple, reliable, low-cost carriers.
    6. Energy-saving equipment: stand-alone energy-saving 15 percent to 30 percent, more than double the energy system;
    7. Nesting population adjustment range, can meet the requirements of different users;
    8. Low noise, dust less
    E-breakers use and the use of:
    1.the Series E Breakers (E-breaking) mainly used for metallurgical, mining, chemical, cement, construction, ceramics and refractories, such as for the industrial sector in Grinding and broken all kinds of minerals in hard rock and use.
      2. the series of jaw breakers (broken jaw) the most appropriate broken compressive strength of not more than 300 MPa (MPa) of hard and soft ore, was broken material may not be larger than the largest block of technical parameters under the table .
           Large breakers of the installation process relatively trouble, the need for lifting machinery, aircraft in trial operation, should pay attention to double-check circuit and the distribution cabinet. Prevent accidents. Large breakers in the production process, should pay attention to maintaining a timely manner, the abnormal phenomenon should immediately stands check to see which parts of the machine failure, it should be timely maintenance. To ensure the normal operation of machinery.
    Jaw Breakers troubleshooting
    Occurrence 1: Host sudden shutdown (commonly known as: nausea vehicles). Reasons: 1) plug the nesting population, resulting in wholehearted blocking materials; 2) rotation of the drive shafts round of the 1.30-belt, the belt slipping 3) bear the eccentric shaft sleeve loose, causing the rack no bearing on both sides of the Gap, the eccentric shaft stick, not rotation; 4) at work and low voltage, host encountered Daliao, the inability broken; 5) bearing damage. Exclude: 1) I plug the removal of nesting, to ensure smooth flow of materials, 2)-tight belt or replacement of 1.30, 3) re-install or replace bear the hub, 4) are at work and for the voltage, so that it operates in line with the mainframe Requirements, 5) the replacement of bearings.
    Occurrence 2: Host tank round, moving the jaw in normal operation, but the broken stop work. Reasons: 1) tension spring fault; 2) drawbars fault; 3) loss or plate elbow fracture. Exclude: 1) the replacement of tension spring; 2) the replacement of drawbars 3) re-install or replace the elbow plate.
    Occurrence 3: output of less than factory standards. Reasons: 1) the hardness or broken materials toughness over the provisions of the Manual, 2) electrical wiring to the anti-location, a host anti-car (a jaw clockwise rotation), or motor triangle to law to access law into astrocytes 3) provides nesting population is less than the limit, 4) shift the jaw plate, top teeth and tooth relatively Top 5) low-voltage work at the scene; 6) moving the jaw and bearing wear after the gap is too large, so that bearing in outer ring Relative rotation. Exclude: 1) to replace or increase the crusher, 2) the electrical wiring swapped 3) nesting population was adjusted to the provisions of the said statement nesting mouth and Grinding increase for the Breakers, 4) check from the tooth-tooth size, such as To be sub-standard replacement jaw plates, is fixed for the jaw-jaw plate with the activities of the relative position to ensure that addendum to the tooth root, fixed pinched to prevent displacement; 5) at work and increase the voltage, so as to re-host Contains requirements 6) the replacement of bearings or moving the jaw.
    矿山行业的飞速发展是在近几年才开始的,矿山设备行业也逐渐被带动起来,以前在矿山行业还没有发展到一定规模,选矿厂,选煤厂等行业一般用来破碎的设备都是中小型的,也是近几年来也慢慢由于各个行业的生产能力逐渐增长,这种成产能力已经跟不上生产需要的,许多单位以及厂家对大型破碎设备,矿石设备的呼声越来越强烈。逐渐大型颚式破碎机(大型颚式破碎机)也就应运而生了。
  1. 上一篇:自动装配模型注塑模具外文文献和中文翻译
  2. 下一篇:破碎机的外文文献和中文翻译
  1. 汽车乘员舱的声振耦合英文文献和中文翻译

  2. 立体光照成型的注塑模具...

  3. 数控机床英文文献和中文翻译

  4. 工业机械手英文文献和中文翻译

  5. 低频振动的铁路车轴的状...

  6. 接头的形状对沥青塞接头...

  7. 数控加工技术英文文献和中文翻译

  8. 大众媒体对公共政策制定的影响

  9. java+mysql车辆管理系统的设计+源代码

  10. 河岸冲刷和泥沙淤积的监测国内外研究现状

  11. 杂拟谷盗体内共生菌沃尔...

  12. 酸性水汽提装置总汽提塔设计+CAD图纸

  13. 当代大学生慈善意识研究+文献综述

  14. 中考体育项目与体育教学合理结合的研究

  15. 十二层带中心支撑钢结构...

  16. 电站锅炉暖风器设计任务书

  17. 乳业同业并购式全产业链...

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回