摘 要:本设计主要介绍并分析了年产12万件金属制品生产项目的基本概况以及与该项目有关的环境状况、环境问题等,通过现场勘探等多种方法对工程区域环境现状进行调查与评价,并且依据《中华人民共和国环境保护法》、《中华人民共和国大气污染防治法》、《中华人民共和国水污染防治法》等相关国家法律法规对该建设项目施工期和营运期可能造成的环境影响进行分析、预测和评估,并针对这些影响提出预防或者减轻的对策和措施,最后形成了该建设项目的环境影响报告表。56015
毕业论文关键词:环境影响评价,环境目标,工程分析,总量控制,污染因子
Abstract:This design mainly introduces and analyzes the basic situation of An annual output of 120,000 metal products projects and environmental conditions, associated with the project's environmental problems. Through a variety of methods, such as field exploration ,we can carry out an investigation and evaluation of environmental in the project area. According to the national laws and regulations, such as the Environmental Protection Law of the People’s Republic of China, the People’s Republic of environmental impact assessment guideline, the People’s Republic of environmental impact assessment method and so on , environmental impact of the construction project construction period and operation period may cause analysis, prediction and assessment, and puts forward the countermeasures and measures to prevent or mitigate against these effects, the final form of the construction project the environmental impact statement.
Key words:Environmental impact assessment, environmental goal, engineering analysis, total quantity control, pollution factor
目 录
1 编制说明 7
2 编制依据 7
2.1 法律、法规、政策 7
2.2 技术导则 8
2.3 项目依据 8
3 建设项目基本情况 9
4 当地社会、经济、环境简述 9
4.1 地理位置 9
4.2 自然环境概况 12
4.2.1 地形地貌 12
4.2.2 气候概况 13
4.2.3 水文概况 13
4.2.4 土壤植被 13
4.3 社会环境 14
4.4 环境功能区划及评价标准 14
4.4.1 环境功能区划 14
4.4.2 环境功能区划 15
4.5 环境质量现状 15
5 主要环境保护目标 17
5.1 主要的环境问题 17
5.2 主要的环境目标 17
6 工程分析 17
6.1 工程概况 17
6.2项目平面布置 17
6.3 主要生产设备 18
6.4 主要原辅材料及能源消耗定额 18
6.5 生产工艺流程 18
6.6 污染源分析 19
6.6.1 废水 19
6.6.2 废气 19