A key step in the design is the workshop layout in the manufacturing, which has explicit relation with the workshop of the occupied land and the investment funds. The final one is the medium-voltage cable’s product performance analysis, first of all it is analyzed in general in this industry, containing some of the technology and the introduction of equipment at home and abroad. The second procedure is to do the introduction of the main type of medium voltage cable, the primary model of which are YJV, YJV22, YJV32, YJV42, etc. To sum up. the last one is to do a general description of the production process.
Keywords: copper strip; T2, TU1; process system; mechanical parameters
目录
1绪论 1
1.1 概括 1
1.2国内铜产业发展的现状 1
1.3 设计安排 1
1.4 设计原则 1
2 市场分析 3
2.1 中国铜板带行业发展状况 3
2.2 国内铜板带材生产与消费情况 3
3 设计方案 5
3.1 生产规模及产品方案 5
3.2 主要生产工艺和设备简介 5
3.2.1 主要生产工艺及工序 5
3.2.2 设备简介 5
4 工艺制度制定 12
4.1 熔铸工艺制定 12
4.1.1 TU1、T2产品熔炼工艺制定 12
4.2 加热工艺的制定 12
4.3 TU1、T2轧制生产制度制定 12
4.3.1 TU1、T2产品轧制生产制度制定 12
4.3.2温度制度 15
4.3.2 速度制度的确定 16
4.3.3 张力制度的确定 17
4.3.4 辊型制度 19
4.4 热处理工艺的制定 23
5力能参数的计算 24
5.1 轧制压力的计算 24
5.1.1 TU1、T2产品轧机轧制压力计算 24
5.2 轧制力矩和传动总力矩计算 25
5.2.1 TU1、T2产品轧制力矩和传动总力矩的计算 26
6 设备强度校核 32
6.1轧辊强度计算及校核 32
6.1.1二棍板带轧机的轧辊强度校核 32
6.1.2四辊板带轧机的轧辊强度校核 32
6.2轧机机架强度校核 33
6.3电机能力校核计算 34
7辅助设备能力计算 36
7.1 热处理炉能力计算 36
7.1.1 步进炉 36
7.1.2 钟罩式退火炉 36
7.2 剪切机设备能力计算 36
8车间主要技术参数的考核指标 38
8.1成品率 38
8.1.1 TUI成品率的计算 38
8.1.2 T2成品率的计算 38
8.2轧机小时产量 38
8.2.1 TU1轧机小时产量 39
8.2.1 T2轧机小时产量 39
8.3轧机平均小时产量 40
8.4年产量的计算 40
9 生产车间平面布置 42
10新设备与新工艺 43
10.1新设备 43
10.2新工艺 43
11 设计结论 45
致谢 46
参考文献 47
附图 48
1绪论
1.1 概括
本课题是:2.5万吨冷轧纯铜板带生产车间工艺设计。在课题中对该类产品作相关工艺设计并详尽阐述T2、TU1纯铜板带产品的性能及其要求。
目的是对紫铜带有一个全面的了解,从生产工艺、产品性能等方面全面了解。并确定出符合现有设备条件下,最经济最环保的工艺链设计。
- 上一篇:钛酸钡掺杂稀土铕的合成与性能研究
- 下一篇:烟草净油的制备工艺及香气成分研究
-
-
-
-
-
-
-
当代大学生慈善意识研究+文献综述
大众媒体对公共政策制定的影响
河岸冲刷和泥沙淤积的监测国内外研究现状
中考体育项目与体育教学合理结合的研究
电站锅炉暖风器设计任务书
杂拟谷盗体内共生菌沃尔...
十二层带中心支撑钢结构...
乳业同业并购式全产业链...
酸性水汽提装置总汽提塔设计+CAD图纸
java+mysql车辆管理系统的设计+源代码