菜单
  

      The mould designer is frequently confronted with a confronted design that incorporates a recess or projection which prevents the simple removal of the moulding from the mould.The component designer,while endeavouring to produce in line of draw component designs,has often to include a recess or a projection to perform a particular function or to satisfy an artisitic requirement.A moulding which has a recess or projection is termed an undercut moulding.The mould design for this type of component is inevitably more complex than for the in line of draw component,as it necessitates the removal of that part of the impression which forms the undercut prior to ejection.
      The final stage which must be undertaken when designing an injection mould is that of checking the completer drawing. During this most important stage the design is scrutinized in a critical manner with the objects of discovering and correcting errors which may have occurred. The errors may be in design, or in drawing or in dimensioning.
      When the drawing is complete, the draughtsman has the unique opportunity of being able to re-examine the overall design to ensure that the inpidual features combine to form a workable and efficient mould unit.
      For the mould draughtsman, the process of checking is essential to ensure that errors incorporated in the drawing are not produced in the manufactured mould. Naturally if an error remains undetected, and if the mould is manufactured to specification, considerable expense and delay will be incurred in making the necessary corrections. It is sound practice to have the mould drawing checked by an independent design(a checker) who, not having been connected with the design previously, will be able to check the drawing quite impartially. However, the fact that a drawing is subsequently scrutinized by a checker must not prevent the draughtsman from checking the design thoroughly himself.
      当设计塑料模具时,通常初学者经历的主要是应该从哪里下手以及应该采取的一般步骤是什么。本课内容包括介绍性的指导,使读者能够遵循确定的步骤来上掌握设计模具的方法。
        实际上,模具制图通常包括三个视图,即:动模的俯视图、定模的俯视图及动定模的俯视图。这个总装配图应该包含足够的信息,以使绘图员可以画出每一个模具零件的详细图纸。然而,对于初学者,只画两个视图就够了,通常选择的这两个视图时动模部分的俯视图和整个模具的俯视图。
  1. 上一篇:土木工程地下空间的利用英文文献和翻译
  2. 下一篇:注塑模具流道设计英文文献和中文翻译
  1. 立体光照成型的注塑模具...

  2. 开口端纺纱系统中的锥形...

  3. Java技术的Web应用设计模型...

  4. 网站设计英文文献和中文翻译

  5. 工件焊接机器人的设计英文文献和中文翻译

  6. 冲压工艺规划和级进模设...

  7. 船舶结构优化设计英文文献和中文翻译

  8. 乳业同业并购式全产业链...

  9. 大众媒体对公共政策制定的影响

  10. 电站锅炉暖风器设计任务书

  11. 当代大学生慈善意识研究+文献综述

  12. 河岸冲刷和泥沙淤积的监测国内外研究现状

  13. 杂拟谷盗体内共生菌沃尔...

  14. 十二层带中心支撑钢结构...

  15. java+mysql车辆管理系统的设计+源代码

  16. 中考体育项目与体育教学合理结合的研究

  17. 酸性水汽提装置总汽提塔设计+CAD图纸

  

About

751论文网手机版...

主页:http://www.751com.cn

关闭返回